Use a traceable factory record

Acceptance is easier to review when the physical unit and the project record point to the same configuration and version. Record deviations rather than leaving them implicit.

Items a record can include

The following items provide a practical review structure; they are not a claim that every project has completed every check.

Acceptance record checklist

  • Appearance
  • No-load running
  • Pressure
  • Pressure holding
  • Leakage
  • Electrical items
  • Configuration and document version
  • Exceptions and follow-up

Confirm the project criteria before release

Required standards, test conditions, documents and release criteria depend on the application and destination market. They should be agreed in the project files rather than inferred from a general checklist.

FAQ

Frequently asked questions

Does this checklist prove a unit has passed acceptance?

No. It describes items that can be recorded. Project-specific records and criteria are needed to make an acceptance decision.

Which version should the record identify?

Identify the configured unit and the related document version so review can trace the record to the delivered project configuration.