Engineering verification & documents
Measure the energy saving and check stable production with our engineering team. Explore energy comparison methods, project checks and product documents to prepare your retrofit.
FIXED DUTY CYCLE
Record the baseline, then re-test on the same boundary.
- 01
Define the boundary
Identify the machine, motion, stable duty cycle and measurement start and end points.
- 02
Record and configure
Record the existing baseline, then confirm a direction around load, dynamics, installation and budget.
- 03
Re-test on the same boundary
Repeat measurements on the same machine, duty cycle and measurement boundary, and record exceptions.
REVIEWABLE RECORD
A reviewable record should identify at least
- Machine and motion description
- Duty cycle and measurement start and end points
- Pressure, flow and energy records
- Environment, temperature rise and exception records
- Solution configuration and revision
- Re-test date and record owner

STANDARDS BOUNDARY
Engineering for your equipment and market
We review hydraulic system requirements, machine duty and destination-market needs together with the design, interfaces and acceptance checks. Tell us about required standards or certification documents during selection so we can assess them with the project.Review SC-QT specifications and codesDOCUMENTS
Documents currently available
Download the bilingual SC-QT selection data sheet to compare specifications and configurations. Contact our engineering team for installation dimensions, port drawings and project test information.
Submit a duty-data RFQENERGY INTO VALUE
Less idle running. More value.
Make each holding phase count. Stop the motor after motion, then recharge when pressure reaches the set threshold, reducing energy use and heat from continuous idle running.
Save 75% or more in short-motion, long-hold applications. Turn reduced electricity use into lower running costs and get more value from every clamping cycle.
Hydraulic power unit verification documents
For SC-QT verification, identify the model, duty conditions and required pressure, holding or control checks. Hydraulic test documents should state the method, conditions and equipment tested. Hydraulic project evidence from another installation cannot replace the acceptance record for your own machine.