KNOWLEDGE / 2026.09.04
Hydraulic Power Unit Sizing Guide
Start with what your machine needs to move and hold. Record the pressure, flow and cycle time. Then check the power supply, available space, ports and required documents with an engineer.
Published:
Revised:
Describe the equipment and motion first
Describe each machine action in order: move, clamp, hold and release. For a machine builder or fixture buyer, this sequence helps explain the job the power unit must do.
For workholding, record movement time and holding time separately. Do several stations move at once? What pressure must each clamp hold? Add the electrical supply and available space to the same note. These details help the engineer assess the whole cycle.
Prepare the operating inputs
Bring the known values to the first engineering conversation. Unknown items can be identified for follow-up rather than assumed.
Minimum data set
- Equipment and motion description
- Operating pressure and required pump flow rate, with units
- Duty cycle and pressure-holding requirement
- Power supply
- Available installation space and port details
- Destination-market documents and requirements
Keep the selection boundary visible
Use the SC-QT manual to make a shortlist. Before ordering, confirm the model, ports, power supply and required documents with engineering. A listed configuration does not fit every machine.
FAQ
Frequently asked questions
Can we start before every value is known?
Yes. Submit the known equipment, motion, pressure, flow and duty information first; missing inputs should be confirmed during project review.
Is a current manual configuration an automatic match?
No. Manual-listed configurations support pre-selection only. Final fit requires confirmation of the project boundary and documents.